Thursday, February 14, 2008

THE END IS NEAR!

This is a view of the front room on the first floor of the new offices. The walls are painted, the carpeting is installed, and the tile entryway can be seen at the doorway.

You can see the church building across the street. The outside door of the church behind the permit on the right side of this window is the one from the last post showing the location of the new steps coming from 102. The other door on the left, the dark one, goes into 102 also.

Most of the electrical outlets and switches have been installed and covered. You can see some of them in this view if you look carefully.

Dave

No comments: