This is the box in the parking lot that houses the connections for the new electrical service. The slot coming toward you in the picture goes all the way to Eagle road. It is for a 13.2 thousand volt feed to the box. A transformer about the size of a volkswagen beetle standing on it's bumper will be installed on top of the box. There is a second slot in the parking lot that goes from the box to the church building ( left from the pipe sticking up from the hole). It enters in the small room in 103 that is next to the Library wall. This is for the 1200 Amp service to the church. This is quite a bit larger than your service at home which is usually 200 Amp or less.
If you were listening in last Sunday service when Jody made his announcement you already know that we are back on schedule for the work being done. The architects have been contacted to see if we can reduce the cost by moving the elevator inside the building. The wooden stakes in the lawn are for positioning the exterior lighting for the property.
Also, we are pursuing a building loan from two banks at the same time.
This loan is needed to finance the work until the funds come in over the three year period of the pledges. This would be a good time to make a pledge if you haven't done so.
Your continued prayer for the New Century project is appreciated.
Dave Frank
No comments:
Post a Comment